Preparation
The first step is to hunt the boat shed for, ropes, pulleys, shackles, sails and various other bit's and pieces needed during the process. This usually end's up in a big pile on the boat shed floor. The mizzen mast is also lowered from the roof, manhandled to the dock side and then aboard.Masts
Meanwhile a small temporary mast has been lashed to the main mast tabernacle (the bit that supports the mast) with a pulley attached to the top and rigged ready to raise the mizzen.
Two of the mizzen shrouds (wires that steady the mast) are attached to the mizzen and onto the bulwarks, via a system of ropes and pulleys. These are used to steady the mast during the lifting process. With the use of the deck winch the mizzen is stepped (raise and set the mast in place) and locked into place. The remaining shrouds are then fitted, the mast adjusted and the temporary mast removed.
Next dress the masts with the rigging blocks; these blocks are then reeved (threaded), with the right bits of rope. The main mast needs to be done in order from the top down; this is completed using a Bosun’s chair. Note the high tech method used to ensure we send up the blocks in the correct order!
Booms gaffs and sails.
These are recovered from the boat shed with the booms and gaffs fitted first. This also requires a lot more reeving of blocks. Next is the bending (attaching) of the main and mizen sails which are usually given a bit of airing before being lowered, folded and lashed onto there respective boom. Finally the sail covers are fitted.Odd's and ends.
Attach Shamrocks lifebelts to the mizzen mast shrouds, attach the navigation light boxes to the main mast shrouds. Fit the bowsprit (pointy bit that sticks out the front), oops wrong way up, fouls the anchor windlass, remove and refit the correct way up.
The staysail and jib still need to be attached before Shamrock is completely rigged.
No comments:
Post a Comment