Friday, 12 December 2014

Storm Preparation

During last winter a number of Shamrock's mooring lines snapped during the various storms, luckily not all in the same storm. As a result of this the old natural fibre mooring ropes are gradually being replaced with man made nylon rope which will last a lot longer, have a bit of stretch and shouldn't get fungus growing on them. Shamrock purists need not get alarmed as her rigging ropes are still hemp and these are renewed with hemp ropes when required (quite regularly).


Temporary winter covers are being prepared for the openings left when the after deckhouse and forward companionway hatch are removed to the boat shed. These covers will also need to allow for the ventilation of the forward and after cabins.


No comments:

Post a Comment