Sunday 13 December 2015

Nancy Belle Update

As the Nancy Belle 2016 river trips are scheduled to start on the 29th April she is currently getting most of the crew's attention, not to mention the fact that it is dry in the boat shed. The foredeck has now joined the afterdeck and been ripped out due to a wet patch, discovered when the forward bulkhead was removed, failing to dry out. Deck support stringers plus cross members have been manufactured, checked for size, removed and are now ready to be painted. With the removal of her after deck and bulkhead, access to the after section of inner hull and transom is a lot easier. This section is being slowly scraped and sanded back to bare wood.




At present the only activities happening on Shamrock are the occasional pumping out and salting.