Saturday, 19 November 2016

Shamrock Camping

With the winter derigging, decluttering of Shamrock almost complete and a start made to the erection of temporary winter covers, it looks as though Shamrock is ready to receive campers. The crew is glad to report that the forward cabin is almost completely dry as the painting out of this cabin is one of the tasks that is hoped to be completed over the winter months.


Advantage was taken of Fridays high tide to drive Nancy Belle half way up the boat shed slipway before being roped approximately 3.5 meters (12 ft) to its winter storage position. The boat shed is starting to get crowded with the addition of Shamrock's skylight/companionway (commonly known as the "deckhouse") ready to be dried out before being painted/varnished.



No comments:

Post a Comment