Saturday 5 August 2017

Track Laying

No sooner had the job of clearing Shamrock's slipway of accumulated mud had been completed, than a lorry appeared with some second hand “rail chairs”, “fishplates”, “steel clips” and “rails” ready for laying. The clips should hold the rails more securely than the wooden wedges used on the old track. A few tricks on how to make the job of fitting of the remaining tracks where picked up during laying of the two topmost sections of the track. Shaune was heard muttering something about being a boat-builder not a railway navvy!




Two down four to go.
The new door fitted between the after cabin and the cargo hold has had a latch made and fitted that is more in keeping with Shamrock's existing door latches.


Space is getting a bit tight in the boat shed!