Saturday, 16 March 2019

Extra Shipwrights

Since Josh left for Iceland Shuggs has been joined by Julian Gray, Mark Lane and Daniel Butlin on various days. Daniel is a volunteer work experience student from Falmouth Marine School. The crew is wondering how Shuggs is treating his helpers as Julian has already left for Thailand!
  • With the fitting of Shamrock's last ‘Shutter’ plank, her hull is now complete. Nail hole pugging and fairing of her new planks is being progressed.
  • Camber has been added to the cargo hatch coaming ends, eight new shoe-cleats have been bolted to the inside of the coaming these take the two 'drop in' hatch beams and four ends of the six fore and aft beams. Each of the six fore and aft timbers have rebates in their upper faces for the edges of the hatch-covers. The existing beams have been dropped into place along with the hatch boards. The hatch boards are being checked for fit with some trimming still required to make them flush with the coaming.



  • Oak packing pieces have been fitted to the bottom of the ‘Hawsepipes’ to enable the extending of the line of the covering boards to the ‘Stem post’.
  • Both port and starboard sides of the ‘Breasthook’ have been through bolted back into place
  • A start has been made on the caulking of the new hull plank seams.