  • The laying of both port and starboard side deck planks, up to the cargo hold hatch coaming, has now been completed. After completion it was found that both of the side decks had a spring to them when walked on. So, to stiffen them, a total of eight Oak straps of 4 in (100 mm) x 2 in (50 mm) have been fitted to the underside of the decks at evenly spaced distances between the ‘hanging knee’ supported half beams. The outer ends are tenon-jointed into the beamshelf, and the inner ends coach screwed to the underside of cargo hatch coaming. The deck planks were then ‘coach’ screwed onto the straps. The extra stiffness will reduce the plank movement that can be compromising to the water-tightness of the caulked seams.


  • Fitting of the fore deck planking has started and is progressing well.
  • Both the forward companionway and the aft deckhouse coamings have been completed and bolted into place. The companionway and deckhouse now need to be removed from storage to check if they fit correctly.

No comments:

Post a Comment