Monday, 16 September 2019

Odd Jobs.

On Shamrock the first of the cargo hatch coaming dog cleats have been fitted.


Fitting of her ‘chain-plates’ has been completed.


A total of 36 bolts, made up of a combination of new and old, have been fixed to Shamrock's port side bracing her ‘beamshelf’ and ‘hanging knees’. Some were missing and some replaced undersize bolts fitted during previous repairs.


To cap the hull bolt and nail heads, that have insufficient counterbore to hold a wooden plug, a mixture of ‘trowel on Bitumen Mastic' (black butter), P.V.A. glue and cement has been used. Once set theses will be sanded flush and given a coat of bitumen paint.


In the boat shed new ‘thumb cleats’ have been cut from an oak offcut and are undergoing their final shaping.



No comments:

Post a Comment