With the fitting of the last of the chainplates delayed until an order of freshly manufactured coach bolts arrive
Shamrock is being prepared to be exposed to the elements.
- The covering boards, bulwarks, capping rails, wash strake and cargo hold coaming have all received a coat of black gloss.
- The starboard hull to the waterline and the transom have been coated with bitumen roofing paint.
- Forward companion way and after deck house coamings have been sanded and primed.
- The decks have received two good coats of a mixture of boiled linseed oil and paraffin, rain that gets through Shamrock's cover now bead of the deck.
- Warping horse undercoated.
- Layers of old bitumen being scraped off her original port side hull planks.
No comments:
Post a Comment